Drone Factory Proposal

Portal / Programs / Factory Build

Build Your Drone Factory With Us
Drone Factory Proposal

Build Your Drone Factory With Us

From a pilot production cell to a sovereign drone campus, layout, NDAA-aligned sourcing, CNC part production, workforce and export governance in one proposal.

Three factory teasers
Pilot Production Cell
Teaser 01

Pilot Production Cell

50-150 airframes / month · Operational in ~16-24 weeks

A compact assembly, avionics bench and flight-test cell that turns a validated prototype into repeatable low-rate production.

  • Floor plan & station layout
  • ESD-safe avionics benches
  • Flight-controller test fixtures
  • Traveler & serial-number tracking
Get this proposal
Scaled Assembly Line
Teaser 02

Scaled Assembly Line

300-1,000 airframes / month · Phased over ~9-14 months

Multi-station line with automated screwdriving, composite part supply, motor/ESC test and burn-in, built for multi-shift output.

  • Line balancing & takt design
  • In-house CNC / additive part cell
  • End-of-line flight acceptance
  • Supplier qualification & NDAA sourcing plan
Get this proposal
Sovereign Drone Campus
Teaser 03

Sovereign Drone Campus

Multi-product, 1,000+ / month · Master-planned, 18-30 months

Greenfield or brownfield campus with production halls, flight range, training center and secure program space for allied partners.

  • Site selection & master plan
  • Workforce training academy
  • Test range & airspace coordination
  • Export-control and governance framework
Get this proposal

Capacities and timelines are planning ranges, not quotes. Final figures follow a site survey and requirements review.

What the full proposal covers
  1. 01
    Executive summary
    Your mission, target volumes and why the factory pays back.
  2. 02
    Product & demand model
    Airframe families, payloads, annual volumes and ramp curve.
  3. 03
    Facility concept
    Layout, stations, clean areas, flight test and utilities.
  4. 04
    Supply chain & sourcing
    NDAA-aligned components, CNC and additive part plan, alternates.
  5. 05
    Compliance & export
    ITAR/EAR screening, end-user controls, data governance.
  6. 06
    Workforce & training
    Staffing plan, technician curriculum, certification path.
  7. 07
    Schedule & budget ranges
    Phased milestones, capex/opex bands, decision gates.
  8. 08
    Commercial options
    Build-transfer, co-production, or managed-operations models.
Illustrative case studies